(310) 453-2397
Mary Star High School

Mary Star High School

HVAC Design & Installation Mary Star High School This Broadway Industries project consisted of installing a new air conditioning system for a two-story, 37,000 square feet, classroom and administration building. Additionally there is also a 10,000 sqare feet gym...
Blessed Kateri Tekakwitha Catholic Parish

Blessed Kateri Tekakwitha Catholic Parish

HVAC Design & Installation Blessed Kateri Tekakwitha Catholic Parish Blessed Kateri Tekakwitha church is a new 1 story 27,000 square feet project which has a seating capacity of 1,300 as well as a 100-seat chapel. Broadway Industries redesigned the original...
NPR/KPCC Radio Station

NPR/KPCC Radio Station

HVAC Design & Installation NPR/KPCC Radio Station NPR had acquired an empty 46,000 sqare feet building as the new home for KPCC. Broadway Industries completed the redesign and installation work for the heating, ventilating, and air conditioning (HVAC) system...
Le Lycée François High School

Le Lycée François High School

HVAC Design & Installation Le Lycée François High School   Le Lycée, an existing French high school, acquired property to build this new 40,000 square feet school. Based on Broadway Industries’ redesign and installation work, the heating, ventilating...